Competences – Construction

Also in construction planning RONACHER ZT GmbH possesses longstanding experience with all building material disciplines, from steel to lightweight construction and novelty special materials:

  • Steel / Steel concrete
  • Fibre concrete
  • Constr. wood construction
  • Aluminium
  • Glass
  • Plastics
  • Lightweight constructions
  • Special materials

Our service range includes the complete process:

  1. Draft
  2. Submission planning
  3. Execution planning
  4. Construction supervision
  5. Approvals

Among others, we use the following CAD programmes for the achievement of our goals:

  • AutoCAD
  • AbisCAD
  • BricsCAD

Bridge Construction

Steel composite framework construction as
continuous beam with a floating foundation
(vibro replacement). The installation of the
framework was done during ongoing railway
operation.

Hereafter you can find excerpts from a project with invitation to tender with
all commercial-technical relevant information.

Detail project bearing for train project

Railway bridge

Thrust bearing railway bridge

Cross section railway bridge

Detail project thrust bearing

Detail project concrete sections

Further Constructions

Many companies draw from the longstanding experience of RONACHER ZT GmbH. Reliability and fairness towards our business partners and customers, and efficient and quality oriented project processing characterize the company principle.

Due to excellent technical equipment we conduct specialist planning and expert opinions in quality controls for the securing of all agreed goals.

Roofing of a weight measurement station for a
train loading company: Realisation in statics
and construction as 3D-model with all
workshop specifications – partially as 1:1
masks.

Finite-Elemente Methode

Pipe pole: Detail planning of a pipe pole for
mobile telephony providers

Pyramid: Realisation of a steel framework on a
steel framework grid with full area glass
panelling

Finite-Elemente Methode

Current situation recording: Due to lacking
technical information the current status was
recorded with a subsequent 3D-illustration